Apply critical path method to manufacturing, combine with CAD/ CAM technology, the AOE net model is established in which take machine as node and assign task to machine according to process flow. 将关键路径法具体应用于机械制造业,结合CAD/CAM技术,建立以机床为结点按工序流分配任务的AOE网络模型。
Based on critical path method authors provide improvement method on progress compilation methods of flow process without steps which gains satisfying effect. 基于关键路线法提出了无节拍流水施工进度计划编制的改进方法,取得了满意的效果。
On our most projects Critical Path Method ( CPM) is used for scheduling. 在我们的大多数工程项目中都采用统筹法(关键路线方法,简称CPM)排计划。
Through the use of critical path method and the process of mapping network model, analyse the progress of activities, optimize the process model for the goal of the cost and time. 通过运用关键路径法和绘制网络图对过程模型中活动进度安排进行分析,并且以时间-成本为目标对过程模型进行优化。
The critical path method was originally developed to solve scheduling problems in an industrial setting. 关键路线方法最初的发展是为了解决一项工业安装的安排问题。
Based on Critical Path Method ( CPM), the trade-off among time, cost and quality of a process was achieved by appropriate distribution of resources among the activities of the process. 利用关键路径法,通过在多个活动中合理分配资源来使整个过程的时间、成本和质量达到折衷。
The basic methods of management ard control of construction projects are the Program Evaluation and Review Technique ( PERT) and the Critical Path Method ( CPM). 这种用网络来控制和管理工程施工的基本方法有计划评审技术(PERT)和关键路线法(CPM)。
The Critical Path Method is a popular method in network management. 关键路线网络(CPM)是网络管理中一个常用的网络法。
Optimization of Production Logistics Process Flow in Enterprises Based on the Critical Path Method and Theory of Constraints 基于关键路线法和约束理论的生产物流工序流程的优化
In this paper, a model of mixed integer programming for resource optimization in project construction is presented based on the time analysis of critical path method. 本文根据工程项目关键线路网法CPM(CriticalPathMethod)网络计划的时间参数分析,提出了一个工程项目施工过程中资源管理的混合整数规划模型。
The variety of distributions for the critical path method 统筹方法中分布律的多样性
Furthermore, with the CPE North China Company as the research object, the thesis has analysed the key factors in economic benefit and operation optimization with applying AHP ( Analytic Hierarchy Process) and CPM ( Critical Path Method). 论文还以中石油(CPE)华北分公司为实证研究对象,应用层次分析法和网络计划对石油设计企业经济效益影响因素及项目实施优化进行分析,获得较好效果。
To improve its searching efficiency and reach the most optimal plan in short time, the traditional depth first search strategy is combined with other algorithms, such as heuristic arithmetic, critical path method, Petri net and Tabu search. 为了提高专家系统的搜索效率,在使用传统的深度优先搜索策略的基础上,结合启发式算法、关键路径算法,以及Petri网,TabuSearch等优化算法短时间内给出一个最合适的方案。
Compared with the well-known fuzzy network techniques in literature, we have generalized the classical critical path method, and simplified the fuzzy time parameters calculation in large-scale network. 与现有文献方法相比,本文方法拓展了传统的网络关键路线法,大大减少了大型模糊网络时间参数计算的复杂性;
In this paper a new form of planning network and its mathematic model and calculation procedure are developed based on the Critical Path Method. 本文为解决工程计划中分阶段控制工期问题,在CPM网络的基础上提出一种新的网络形式&连锁网络、及其相应的工期控制数学模型与计算方法;
This research also proposes an integrated technique that includes critical path method and the earned value ( EV) approach to project management. 为了加强对进度计划的控制,本文还研究了关键路径法与挣值法的集成应用。
Thirdly, according to Project Management theory, it discussed Critical Path Method ( CPM) and Precedence Diagramming Method ( PDM) in the light of a designing enterprise. 然后,结合设计企业经常接触的项目管理的理论,结合某设计企业,讨论了项目进度计划关键路径法(CPM)及资源分配管理方法&优先日程图示法(PDM)。
To meet the requirement of evaluation and optimization of the workflow model, a critical path method was proposed to support three common structures. 针对工作流模型的结构特点,建立了一种关键路径分析法,增加了对工作流常见结构的支持。
It uses the WBS ( work breakdown structure table), critical path method ( CPM), construction progress Gantt charts and other tools, on the petrol station information construction project management to assess and evaluate the project implementation considerations. 采用WBS(工作分解结构表)、关键路径法(CPM)、施工进度甘特图等工具方法,对加油站信息化建设项目化管理进行了评估及衡量,提出了项目实施的注意事项。
Then analysis the time schedule of the project with Critical Path Method so that the whole progress of the project advancing to become more systematic and Increase the controllability of the project. 然后利用关键路径方法对G18期分组网工程工期进度安排进行了分析和控制,使得整个项目进度推进变得更加系统化,同时增加了项目的可控性。
And through the Critical Chain project management methods and more traditional critical path method of comparison to illustrate the practical application of the results of the practicality and effectiveness of methods. 并通过对关键链多项目管理方法与传统的关键路径方法实际应用结果对比说明了本文方法的实用性与有效性。
Network flow and network graph are merged into safety supervision and management system, and critical path method is used to optimize supervision scheme of safety production program. 将图论中的网络流和统筹图融入安全监管体系,运用关键路径法对安全生产计划监察方案进行了优化研究。
Critical chain method is the critical path method and program evaluation and review technique in the field of project management in recent years as an important development. 关键链法是继关键路径法和计划评审技术之后在项目管理领域近年来的一个重要发展。
Gantt chart method, using the most commonly used methods of mathematical analysis, critical path method, program evaluation and review technique to prepare schedule. 采用最常用的数学分析方法甘特图法、关键路径法、计划评审技术来编制进度计划。
Critical Path Method, Program Evaluation and Review Technique, Graphical Evaluation and Review Technique and Venture Evaluation and Review Technique are all representative network analysis methods. 关键路线法、计划评审技术、图示评审技术和风险评审技术是四种具有代表性的网络分析方法。
By using work breakdown structure and the critical path method, the paper proposes the conversion method from production design information to production management information, building integration platform of production, design and management taking SPAR system as the core. 运用工程分解法、关键路径法等理论,提出解决生产设计信息向生产管理信息转换的方法,搭建了以SPAR系统为核心的设计、生产、管理一体化平台。
By elaborating the knowledge hierarchy of Project Management, and Time Management theory, the article explains Critical Path method of managing time, and how to apply the method. 本文通过对项目管理知识体系和项目时间管理理论的阐述,详细介绍了时间管理中关键路径的理论和使用方法。
Secondly, work breakdown structure, critical path method, tool and method for the preparation of the project schedule. 其次运用工作分解结构、关键路径法等工具和方法编制本项目的进度计划。
Aiming at the virtual single-product flexible scheduling problem, an integrated algorithm based on the allied critical path method is proposed. 对虚拟单产品柔性调度问题提出一种基于拟关键路径法的集成式算法,实现同时解决复杂多产品柔性调度问题的工序优化分配与工序优化调度两个子问题。
When the durations of activities in a planning network are precisely known, Critical Path Method has been proved to be a effective method to make planning. 当工程网络计划中活动持续时间为已知的确定值时,关键路径法被证明为是一个网络计划的有效方法。